blog.abandonedrails.com
The Blog of Abandoned Rails

Slack Industrial Park tour

Print the article

This entry was posted on 8/14/2006 3:12 PM and is filed under website.

While the SIP Tour is posted and browsable, it is not quite finished. Since this was the first tour, it has been a guinnea pig for the process -- presently, all of the description text on the tours homepage is stored in the database. I think I will move it out into HTML so I can display a couple of photos alongside the text for better experience.

So instead of saving the descriptive text in the database for each tour, I will store other pertinent information, such as MPs, length...anything that is available in the employee timetables for the given ROW. So now it's just a matter of updating the database with these figures (which I obtained from other railfans) and designing the new layout. Look for it soon.
 
Trackbacks
Trackback specific URL for this entry
  • No trackbacks exist for this post.
Comments
    • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

Your comment is 0 characters limited to 3000 characters.